1.) Find center between attachment points and mark.
2.) Pre-drill with a 1/4" drill bit for four 5/16 x
4" lag bolts. **NOTE: Screws must go into 4" of solid wood.
3.) Set flange and secure with lag bolts.
4.) Finish lag bolts with a ratchet.
5.) Slide Post Sleeve over flange.
6.) Attach Vinyl Railing according to kit installation
instructions.
7.) Level Rail and Post and cover flange with
*Quickrete.
8.) Tap post with a rubber mallet to settle the
concrete and remove air bubbles.
9.) Glue on Post Cap and make sure post is level.
20 lbs. of concrete for a 4" Post Sleeve and 30
lbs. for a 5" Post Sleeve.
*Quickrete must be an oatmeal consistency.
**NOTE: In some cases, you may not have 4" of solid wood
underneath deck to drill into. In this situation, screw a 2"
extension underneath deck and secure with four 5/16 x 4" lag
bolts |