Tek-Mount Installation



Tek-Mount Kit

Pre-Drill Holes (Supplied self-tapping screws do not need pre-drilling.)
STEP-1

Fasten post mount to wood flooring using (4) 5/16 inch x 4 inch lag bolts. If only 2 lag bolts hit a joist, then anchor the remaining 2 fasteners with 1/4 inch carriage bolts. (Note: If mounting to concrete, then use concrete anchors in place of  5/16 inch x 4 inch lag bolts. Concrete anchors not included)

STEP-2

Place PVC cement in post cavity. Slide post into post mount and fasten using (8) #12 x 1 1/2 inch Stainless Steel self-tapping screws or (pre-drill starter holes into the mount, if you are not using self tapping screws).

STEP-3

Slide New England skirt into place. The skirt will hide the screws used to fasten post to the Tek-Mount.

NOTE: Do not use center hole as single source of attachment.

Tek-Mount Kit

Includes: E-Z Mount, New England Skirt, (8) #12 x 1 1/2 inch Stainless Steel screws and (4) 5/16 inch x 4 inch lag bolts. (concrete anchors are not included in kit)









CONTACT US: customerservice@vinylraildepot.com
Copyright© 2003 VinylRailDepot.com-All Rights Reserved